top of page
Search

Almost There

  • Em and Viv
  • Mar 25, 2015
  • 1 min read

Chassis (CHECK MEASUREMENTS)

  • right rear wheel axle needs securing, it keeps falling out of the motor

  • ​solution: at next meeting add spacers between the outside c-channel and wheel so it can't move and place a shaft collar on the outside

  • front shaft collar keeps hitting the c-channels from the inside (between the motor and metal) at a critical point

  • solved: removed shaft collar and put in tape

  • ​​​Lift

  • ​changed last keps nuts to nylon lock nuts on the top level on both arms

  • Pick-up

  • ​test = good

  • however it is wibbly and hard to align with the skyrise pieces

  • ​need solution

  • need to help cube​ pick-up we need to decrease the angle

  • solution: move the manual stop up one row of holes and add the lip back on the end piece

  • Program

  • added the motor for the pick-up rotation on port 7

  • test = good

 
 
 

Recent Posts

See All
Team Open House

Come out March 19th to visit us and check out our robot friends. If you are an incoming 7th-12th grader you can join the team next year...

 
 
 
Back in the Bay

YAY~We had a successful competition ranking 5th out of 21 robots after qualification matches! We were 3rd seated alliance captains. Thank...

 
 
 

Comments


Recently...
Tag Cloud

2015 Andromeda <3

  • Facebook B&W
  • Google+ B&W
bottom of page