top of page

Still in the Prototyping Phase

tested 8-bar linkage = good

  • cube out/intake will include:

  • a ramp with rollers on either side (2 motors) most likely

  • will need to pull out both arms 2 holes-remeasure cube space

or

  • single roller with high strength gears (1 motor)

  • skyrise pick-up (one of these):

  • bars and rubber (1 motor)

  • cut intake rollers

  • cut tank tread on sprocket

Recently...
Tag Cloud
No tags yet.
bottom of page