top of page

Still in the Prototyping Phase

  • Em
  • Feb 12, 2015
  • 1 min read

tested 8-bar linkage = good

  • cube out/intake will include:

  • a ramp with rollers on either side (2 motors) most likely

  • will need to pull out both arms 2 holes-remeasure cube space

or

  • single roller with high strength gears (1 motor)

  • skyrise pick-up (one of these):

  • bars and rubber (1 motor)

  • cut intake rollers

  • cut tank tread on sprocket

 
 
 

Kommentare


Recently...
Tag Cloud

2015 Andromeda <3

  • Facebook B&W
  • Google+ B&W
bottom of page